Thursday, October 6, 2016

10-6-16

Controlling Operation Bartlett: Lighting and Signage
Controlling Operation Marion: Lighting and Signage
Controlling Operation LaSalle to Ewing: header Curb
Fraction of Day workable 10/10
AM Cloudy rain from 11 to 12 PM Mostly Sunny
Hi 83 Lo 62

Reith Riley had an asphalt crew paving Michigan from Ewing to Sample on the east side. That included a joint sealing crew and a clean up crew. 

Reith riley had a secon Asphalt crew working in the down town are patching back the curb lines and structures.

Reith Riley had  a concrete crew pouring the drive ways on the east side of Main between Jefferson and Wayne. They had a second crew pouring driveways on the east side of Main between Colfax and Washington. they had a third crew pouring header curb from Jefferson to Washington. they had a fourth crew pouring curb between Jefferson and Wayne on the east side of Main.

CE Hughes had a crew milling Main Street on the west side from LaSalle to South street.

Rieth Riley had a prep crew cleaning up behind the CE Hughes on Main Street. A second prep crew worked on grading out for header curb from Jefferson to Washington.

Slussers worked on shrubs mulch and plants in the roundabout at Marion. Chris Thomas met with Eric about the planting of trees.

Pemberton davis worked on the intersection of wayne and Main it is now operational. ZThey also worked at the intersection of Western and Main and Bronson and Main.

Wisco worked on the west side of Main between Marion and Madison.