Controlling Operation Bartlett: Lighting and Signage
Controlling Operation Marion: Lighting and Signage
Controlling Operation LaSalle to Ewing: header Curb
Fraction of Day workable 10/10
AM Sunny PM Sunny
Hi 75 Lo 58

CE Hughes worked on Milling Michigan from Ewing to Sample.

Reith Riley had a prep crew cleaning up behind CE Hughes  on Michigan from Sample to Ewing. A Second prep crew worked on grading out ramps on the west side of Main at Washington and Jefferson. A third crew worked on placing pave drain on Main street on the west side between Jefferson and Washington.

Reith Riley poured curb on Main Street east side from Jefferson to Washington. They had a second crew work on curb ramps on Main Street and Indiana. A third crew worked on side walk on the east side of Main street between LaSalle and Colfax. A forth crew placed header curb between Colfax and Washington and they also poured curb at the North west corner of Main and Jefferson.

Indiana Earth worked on removals on the North west corner of Wayne and Main for electric. They also worked on grading out for between Washington and Jefferson for curb and colfax and Washington for cycle track on the east side of main.

Pemberton Davis worked on light pole foundations on the west side of Main between Colfax and LaSalle. they got the intersection of Main and South Street ready to turn on. They also worked at the intersection of Wayne and Main getting power to the Tesco.

Wisco worked on the drip irrigation to the Marion Roundabout.   