Friday, June 17, 2016

6-16-16

Controlling Operation Downtown: Removals
Controlling Operation Marion: Pipe Work
Controlling Operation Bartlett: Round About Walls
Fraction of Day Workable: 10/10
Hi 77 Lo 57
Weather AM Cloudy, Light Rain PM Cloudy, Light Rain 

Woodruff was installing storm pipe and structures on the west side of Michigan south of Madison. These are the last structures that need to be installed in the Marian section. Woodruff also tied a fired hydrant into an existing water main on Marian at approximately Line A Sta. 22+50. 

Rieth-Riley had a concrete crew pouring curb on the splitter island north of the Bartlett roundabout. They also graded and poured new sidewalk on the west side of Main St. between LaSalle and Colfax. They began grading for sidewalk on the west side of Main between Washington and Jefferson. 

Ziolkowski continued construction of rebar cages and forms for the north and south roundabout concrete walls.

Indiana Earth continued spreading dense subgrade in the Marian section. Sidewalk removals continued on the west side Main St. between Washington and Jefferson. 

Pemberton Davis was working at the intersection of Main and Indiana tying in to existing structures. 

Robert Henry continued running their line east from the intersection of Main and Marian. 