Friday, September 9, 2016

9-9-16

Controlling Operation Bartlett: Lighting and Signage
Controlling Operation Marion: Lighting and Signage
Controlling Operation LaSalle to Ewing: Curb
Fraction of Day workable 10/10
AM Cloudy  PM Light cloudy
Hi 84 Lo 67

Reith riley had a crew pour concrete Pavement on Main Street South of Bronson to just North of Bronson. A Second crew worked on pouring side walk and ramps at Madison and Michigan East side. They also poured concrete side walk in the South East quad of Marion and Michigan.

Reith Riley prep crew worked on cutting out for the brick paver bans on Michigan from Marion to LaSalle. They then went down town and worked on crosswalks and curb radius on the west side of Main. The second prep crew worked on setting the Pave Drain on the West side of Michigan between LaSalle and Madison.

Pemderton Davis worked on Lights and on Michigan from LaSalle to Marion. they also set the cross walk lights for the bikes. They worked on the cross walks at Bartlett( they were malfunctioning).

Wisco worked on Main Street from LaSalle to Marion on the East and West side.

Indiana Earth worked down town on grading out for the headers and the bicycle track. 

State Barricade was on site and placed temp tape at LaSalle and Main. They also stared picking up and taking down extra signs.