Controlling Operation Bartlett: Lighting and Signage
Controlling Operation Marion: Center Aprons and Curb
Controlling Operation LaSalle to Ewing: Curb
Fraction of Day workable 10/10
AM Mostly Sunny  PM Mostly Sunny
Hi 78 Lo 53

Rieth-Riley had a prep crew grading the lower apron of the Marion roundabout.

Ziolkowski was on site installing wall caps on the concrete walls in the Marion roundabout.