Tuesday, May 2, 2017

5-2-17

Controlling Operation Bartlett: Traffic Markings
Controlling Operation Marion: Landscape work
Controlling Operation LaSalle to Ewing on Main: Signals
Controlling Operation LaSalle to Ewing on Saint Joe: Signals
Fraction of Day workable 0/10
AM Mostly Cloudy Rain PM Mostly Cloudy 
Hi 54 Lo 42

Reith Riley had a 5 man crew place the curb for the parking lot north of McDonalds. They then went down and poured the sidewalk  on the east side of MLK just North of Wayne.

Reith Riley had a 6 man brick crew working on the east side of MLK from Wayne to Jefferson.

AirMarking did not show up due to the rain.

Pemberton Davis went home due to the rain.

Dura max had a 5 man crew cutting loops at South and Main and then Monroe and Main. They stared sealing loops at around 11 am due to the rain. 