Controlling Operation Bartlett: Lighting and Signage
Controlling Operation Marion: Lighting and Signage
Controlling Operation LaSalle to Ewing on Main: Signals
Controlling Operation LaSalle to Ewing on Saint Joe: Signals
Fraction of Day workable 0/10
AM sunny windy PM sunny Windy
Hi 52 Lo 42

Pemberton Davis worked on the traffic signal at Washington and Martin Luther King drive they set the signal heads and wired it. They turned it on at around 3:00 Pm. Pemberton Davis also worked on the walk/waits on the intersection of Colfax and Martin Luther King.

Wednesday 3-8

    MLK and Washington; finished installing overhead spans. Pulled in signal cable, set signal heads. Spliced cabinet and disconnects. Turned signals on at 2:50pm. Ran a 3c#8 overhead to feed power to lights in front of old H of F building. 

No other work took place today.