Controlling Operation Marion: Punch List
Controlling Operation LaSalle to Ewing on Main: Signals
Controlling Operation LaSalle to Ewing on Saint Joe: Signals
Fraction of Day workable 10/10
AM Sunny PM Mostly Sunny
Hi 78 Lo 52
Reith Riley had a 3 man crew work on the building at western and Main fixing the tile.
Pemberton Davis had a 4 man crew working at Wayne and MLK replacing the Controller Cabinet. they then went to Lafayette and LaSalle and hung the 5 section heads.
Pemberton Davis had a 2 man crew painting the Mast Arms at Monroe and Main Street.
There was a sink hole that developed on Main Street south of Western in the turn lane that the sewer department repaired.
Wisco had a 5 man crew working on irrigation around the hospital.
Reith Riley had a 3 man crew work on the building at western and Main fixing the tile.
Pemberton Davis had a 4 man crew working at Wayne and MLK replacing the Controller Cabinet. they then went to Lafayette and LaSalle and hung the 5 section heads.
Pemberton Davis had a 2 man crew painting the Mast Arms at Monroe and Main Street.
There was a sink hole that developed on Main Street south of Western in the turn lane that the sewer department repaired.
Wisco had a 5 man crew working on irrigation around the hospital.