Controlling Operation Marion: Lighting and Signage
Controlling Operation LaSalle to Ewing on Main: Signals
Controlling Operation LaSalle to Ewing on Saint Joe: Signals
Fraction of Day workable 0/10
AM Sunny PM Sunny
Controlling Operation LaSalle to Ewing on Main: Signals
Controlling Operation LaSalle to Ewing on Saint Joe: Signals
Fraction of Day workable 0/10
AM Sunny PM Sunny
Hi 42 Lo 28
Pemberton Davis worked on placing street lights on the east and west side of Saint Joe between Colfax and LaSalle. They also worked on the walk waits for Bronson and Main. They also worked on the street lights North of LaSalle on Michigan.
Reith Riley worked on the last of the snow plow markers on saint Joe street.
No other work took place today.
Phil @ Pemberton; "MLK Blvd lighting; set light poles south of La Salle and installed conduit runs to foundations."
Pemberton Davis worked on placing street lights on the east and west side of Saint Joe between Colfax and LaSalle. They also worked on the walk waits for Bronson and Main. They also worked on the street lights North of LaSalle on Michigan.
Reith Riley worked on the last of the snow plow markers on saint Joe street.
No other work took place today.
Phil @ Pemberton; "MLK Blvd lighting; set light poles south of La Salle and installed conduit runs to foundations."