Controlling Operation Marion: Lighting and Signage
Controlling Operation LaSalle to Ewing on Main: Signals
Controlling Operation LaSalle to Ewing on Saint Joe: Signals
Fraction of Day workable 0/10
AM Mostly Sunny PM Cloudy
Hi 30 Lo 20
Pemberton Davis worked on the intersection of LaSalle and Michigan took down the last mast arm and worked on the walk/waits.
Robert Henery worked on the corner of Main and Washington (TCU Vaults).
No other work took place today.
Pemberton Davis worked on the intersection of LaSalle and Michigan took down the last mast arm and worked on the walk/waits.
Robert Henery worked on the corner of Main and Washington (TCU Vaults).
No other work took place today.
No comments:
Post a Comment